​82nd Street Widening and Improvement Project

​The Department of Public Works (DPW) is moving forward on plans to widen and improve E 82nd Street from Hague Road to Fall Creek Road. The E 82nd Street Improvement Project exists in two phases: Construction from Hague Road to Lantern Road (now completed), and construction from Lantern Road to Fall Creek Road. 

The infrastructure improvements include widening the corridor from two to four travel lanes; street resurfacing; the addition and repair of sidewalks, curbs and ADA-compliant access ramps; drainage improvements where needed; and necessary bridge maintenance.

A public meeting was held on February 17, 2015 to address the construction of Phase 1 of the project and the design of Phase 2. The presentation from the meeting is available here: 150217_PIM Presentation.pdf150217_PIM Presentation.pdf

A public meeting was held early 2014 . Updated design materials were shown and can be viewed here.

140618-Aerial Layout.pdfProject Aerial 6/24/2014

 

​A public hearing and information meeting was held on July 9, 2013 at Abundant Life Church on 82nd Street and Hague Road. Updated design materials were shown and can be viewed here:

A public meeting was held on October 8, 2012 at Abundant Life Church on 82nd Street and Hague Road. A preliminary design plan was shown and can be viewed here: